Key points
- Thai mortgages are almost unavailable to foreigners
- The main route is an interest-free plan during construction
- Keeping part of the price until handover protects you from delays
Mortgages
Local banks usually do not lend to non-residents. Some international banks and lenders offer loans to foreigners in foreign currency, typically up to 50–70% of the value at higher rates. Terms are individual, so do not count on a mortgage as your main plan.

Photo: Vibe Downtown, Karon, Phuket
Payment plans during construction
The most common option. A typical schedule:
- Reservation: 50,000 to 300,000 baht.
- Contract: 20–30% within 2–4 weeks of reservation.
- Interest-free instalments tied to construction stages.
- The balance at handover.
Catalogue examples: The Title Kuartz is paid in four 25% instalments, Vibe Downtown as 35% followed by five payments to handover. The more you pay at handover, the lower your risk.
Payment plans after completion
Some developers offer plans on completed units too: a 30–50% down payment and the balance over 1–3 years, sometimes interest-free, sometimes up to 5% a year. The unit is transferred after full payment or with a charge in the developer's favour.
What to check
- What happens if a payment is late: penalties and the developer's right to cancel.
- When ownership passes to you.
- Whether you can sell before paying in full.
- Every payment from abroad in foreign currency with bank documents; see How to pay from abroad.
We will find projects with a convenient schedule for your budget. Every project in the catalogue shows its payment plan.

Photo: The Title Balcony, Nai Yang, Phuket
Example schedule during construction
A 5 million baht condo, completion in 2.5 years, four 25% instalments:
- reservation: 100,000 baht;
- at contract: 1,150,000 baht (25% less the reservation);
- after one year: 1,250,000 baht;
- after two years: 1,250,000 baht;
- at handover: 1,250,000 baht.
Payments are spread evenly over construction, and a quarter remains until completion, which protects the buyer if there is a delay.
Example with a large handover payment
The same unit with 30% upfront and 70% at handover. You put in 1.5 million baht at the start and pay the main amount only when you see the finished unit. Such schedules are rarer but safer, and suit a resale-before-completion strategy.

Photo: The Zero Nai Yang, Nai Yang, Phuket
If you are short for the last payment
- Ask the developer about a post-completion plan: some agree to 1–3 years.
- Sell the contract before completion through assignment; see Contract assignment.
- Do not skip payments without an agreement: the developer may cancel and keep part of the money.
Exchange rates
Over a multi-year plan the baht rate can move noticeably. The contract price is fixed in baht, so factor in currency risk and, where possible, hold part of the amount in baht in advance.
Frequently asked questions
Can a foreigner get a mortgage in Thailand?
Hardly: local banks do not lend to non-residents. There are a few international programmes.
How much do I need upfront for an off-plan purchase?
Usually the reservation and 20–30% at contract, with the rest in instalments to handover.
Are payment plans available on completed units?
From some developers: 30–50% upfront and the balance over 1–3 years.
What happens if I miss a payment?
Penalties usually apply, and after a long delay the developer may cancel the contract. Check the terms in your contract.
For general information only, not financial advice. Sources: Pearl Property, SENA.
Updated